FAQ
Have questions? We have answers! If you do not find the information you were looking for here, feel free to contact us.
Purchasing process
You’re getting ready to put your project into first gear but don’t know where to start? iLAND is taking the headaches out of building your dream home by eliminating the work site. See below how easy it can be !
FAQ
Building a home can be stressful and there are many questions you should ask. Fortunately, iLAND has the answers and can save you time and skip the hurdles of learning about managing a whole construction site !
inclusions AND OPTIONS
Sure, iLAND can build a home for you, but what can you expect will be included and what options are available ? All our home can come completely finished, see the list below with the bells and whistles available for you.
Purchasing Process
3 easy steps to your dream home… A solar, eco-friendly and healthy construction for your family that produces as much energy as it consumes.

Meet with an associate to assess your project. You could also have the opportunity to visit a model home and see the superior quality of products iLAND. This visit does not commit you to anything and we will be happy to answer any of your questions.
We offer a wide choice of home models, in a wide range of sizes and finishes. However, if we do not already have the model of your dreams, we will easily adapt plans to your needs. That’s the beauty of modular construction! We will establish your list of needs and proceed with the design of an initial construction plan.

Once you are fully satisfied with the concept, we will move on to the production contract for the house. A member of our team will assist you in finalizing the selection of interior and exterior finishes for your home. You can choose elements of plumbing, ceramic tiles, lighting, vanity, exterior paint, roofing, etc.
The construction phase will begin at iLAND and should take 6 to 8 weeks depending on the size of the model. About 4 weeks into this process, preparation of your lot will start in order to be ready to receive your home. The foundation can be a crawl space, a basement (habitable or not) or the house can be placed on piles.

At this stage, we will deliver your modules to your site and our certified contractor will take care of the installation and finishing. A final balance payment is then required before the modules leave the factory. Depending on the size of your project, it will take 3 to 10 days to complete the work.
At the end of the installation and after the final inspection with one of our representatives, a final payment of 20% will finalize your project.
Since you will be very satisfied with your new accommodation as well as our professional and friendly service, you recommend us to your loved ones!
FAQ
3 easy steps to your dream home… A solar, eco-friendly and healthy construction for your family that produces as much energy as it consumes.
Construction FAQ
You’re getting ready to put your project into first gear but don’t know where to start? iLAND is taking the headaches out of building your dream home by eliminating the work site. See below how easy it can be !
Installation FAQ
Building a home can be stressful and there are many questions you should ask. Fortunately, iLAND has the answers and can save you time and skip the hurdles of learning about managing a whole construction site !
Interior
Sure, iLAND can build a home for you, but what can you expect will be included and what options are available ? All our home can come completely finished, see the list below with the bells and whistles available for you.
Exterior
Sure, iLAND can build a home for you, but what can you expect will be included and what options are available ? All our home can come completely finished, see the list below with the bells and whistles available for you.
CONSTRUCTION
What is the insulation for the floor, the wall and the ceiling and what is the used material ?
Floor R-60, wall R-40 and roof R-70 insulated with pressure installed cellulose.
Any thermal bridges in the construction?
Our construction eliminates all thermal bridges for an optimal insulation. We also use triple pane glass on every home to ensure greater energy efficiency.
Any vapor barriers in those components?
There is a vapor barrier used in our construction and we ensure to never cut into it to eliminate any possibility of humidity exchange towards the interior of the house.
What material is the roof made of?
We use a membrane
Is there a crawl space in the roof?
In a flat roof, no. Any space is either insulated or used for ventilation. We do offer an optional angled roof that could have a crawl space
What is the standard ceiling height?
In a standard flat roof construction, the ceiling height is 8’10”.
Is it possible to have an angled roof?
Yes you can! It is optional at an additional cost since the roof cannot be factory installed. The roof will be installed onsite, making the timeline a bit longer after delivery.
INSTALLATION
How long will it take to deliver after commitment and deposit?
It takes 6 to 8 weeks to finish an entire home once the construction process has started.
Is it possible to get a garage or carport that looks the same as the house?
Of course! The garage will be assembled on site with some of the components built inside our factory.
Can we bring in our own plans?
Yes, although the plans will have to be reworked by our engineers with minor adjustments for production purposes.
Can the roof line be continued over the deck to make a screen porch ?
Yes, the deck could be made by a third party and iLAND will provide the roof as part of the house.
INTERIOR
The height of the ceiling?
In a standard flat roof construction, the ceiling height is 8’10”.
Is central air included?
No, it is optional.
Is the kitchen included and is it possible to customize it ?
The kitchen is included in most plans and can be customized with our partner kitchen providers. Our estimates for a fully finished home include an allowance for the kitchen, which can be modified to better suit your needs when you meet with the kitchen manufacturer. The end result will either be a credit or surplus on the final cost.
Is the electricity done for the alarm security system?
Yes, with many options for add-ons.
Is central vacuum possible?
Yes, it is offered as an option.
Can the home be delivered with the walls already painted ?
Absolutely, all finishes are done inside our factory. The only finishes that are not done before delivery are the joints (floor, walls and ceiling) between the modules. Those will be taken care of once the modules are assembled on site.
Ceramics, is installation made at the plant or on site?
Yes, most of the finishes are done inside the factory.
EXTERIOR
What is the standard warranty for the roof?
The manufacturer garanties the membrane for 50 years
The maximum height of the modules?
The maximum outside height of the modules is 11′ 6″ to meet the delivery requirements
Can the windows frame be different then white?
Yes, the is an option for black frames
Inclusions & Options
3 easy steps to your dream home… A solar, eco-friendly and healthy construction for your family that produces as much energy as it consumes.
Construction FAQ
You’re getting ready to put your project into first gear but don’t know where to start? iLAND is taking the headaches out of building your dream home by eliminating the work site. See below how easy it can be !
Installation FAQ
Building a home can be stressful and there are many questions you should ask. Fortunately, iLAND has the answers and can save you time and skip the hurdles of learning about managing a whole construction site !
Interior
Sure, iLAND can build a home for you, but what can you expect will be included and what options are available ? All our home can come completely finished, see the list below with the bells and whistles available for you.
Exterior
Sure, iLAND can build a home for you, but what can you expect will be included and what options are available ? All our home can come completely finished, see the list below with the bells and whistles available for you.